The reconfiguration of existing parking areas introduced local crushed coral stone to increase the site permeability by fifty-percent to meet code requirements while significantly reducing overall site engineering cost. Along the highway, a five-hundred and twenty foot long swath of Coastal Muhly Grass will become vibrant pink throughout late summer into early fall.